Building Economics and Quantity Surveying
Prepare an early-stage construction cost plan, organise work by trade, and separate material, labour and other costs. Save a working draft in this browser or export the schedule as CSV.
Construction Take-off & Labour Planning
Quick preliminary calculators to support early planning. Confirm structural specifications, mix design, local material sizes and actual productivity with the project team.
Consolidated Preliminary Materials Schedule
Combines the current take-off calculators into one purchasing-planning summary. Values update when inputs or mix selections change.
- Concrete cement
- —
- Blockwork mortar cement
- —
- Plaster cement
- —
- Screed cement
- —
- Total indicative cement
- —
- Concrete sand
- —
- Blockwork mortar sand
- —
- Plaster sand
- —
- Screed sand
- —
- Total indicative sand
- —
- Coarse aggregate
- —
- Blocks
- —
- Reinforcement steel
- —
- Paint
- —
- Tile coverage
- —
- Excavation
- —
- Backfill
- —
- Hardcore
- —
This schedule is a preliminary consolidation, not a purchase order. It assumes indicative dry-volume factors and standard 50 kg cement bags; it does not account for supplier packaging, moisture, bulking, mix design adjustments or overlapping quantities. Review quantities before procurement.